Upgrade of concrete mixing plant, equipment relocation using 3D scans

 

                                     

CHALLENGE

  • Connection between relocated mobile concrete mixing plant and existing field conditions (silos, buildings etc.)
  • Access to the equipment with health and safety aspects
  • Downtime reduction
  • OPEX cost-out

 

SOLUTION

  • 3D scans of existing plant
  • 3D scans of mobile concrete mixing plant
  • Merging 3D scans together
  • Optimizing process technology
  • Design of a new steel structure for the equipment
  • 3D Model including scans and new steel structure

 

BENEFITS

  • 3D scans showed clashes between mobile mixing plant and field conditions
  • 3D scans allowed to fit equipment to new steel structure
  • New steel structure creates more access area around equipment